The aim of the TSV HANDY project was to contribute to improving output in manufacturing silicon-based products through development of an innovative handling system.


Published on 23 April 2021

​

Hvm AND Yield optimisation


The aim of the TSV HANDY project was to contribute to improving output in manufacturing silicon-based products through development of an innovative handling system.





 

Starting date : Apr. 2015 > Mar. 2018 

Lifetime: 36 months

Program in support : CATRENE, call 7 (2014)


 

Status project : complete


CEA-Leti's contact :

Pierre Montmeat

 

Project Coordinator: RECIF (FR)


Partners:  

  • Evg, (AU)
  • Imec, (BE)
  • Entegris, (DE)
  • CEA-Leti, (FR)
  • Fogale, (FR)
  • Recif, (FR)
  • ST Microelectronics, (FR)
  • Nanium, (PO)



Publications

  • «Mechanical behaviour and delamination mechanisms in temporary bonding», K. Vial et al, conference ESTC 2016,Grenoble, France.
  • «Debonding capacity of mechanical debonding equipment depending on the bonding strength of directly and polymer bonded wafer pairs», K. Vial et al, conference Wafer Bond 2015, Braunschweig, Germany.
  • «Polymer bonding temperature impact on the morphology and on the adherence energy of the bonded stack», P. Montméat et al, conference Wafer Bond 2015, Braunschweig, Germany.
  • «Development and adhesion characterization of a silicon wafer for temporary bonding», P. Montméat et al, International Journal of Adhesion and Adhesives 82 (2018) 100–107.


​Target market: n/a

​

Investment:  € 1.8 m.

EC Contribution: € 0.7 m.



Website


Stakes

  • CEA-Leti activity:
    • The main task of the year was to modify the current 300 mm EVG560 bonder used at CEA-Leti.
      Performed at EVG headquarters, this involved adding a coating capability to the existing tool.
      EVG delivered the coater tool to CEA-Leti in August 2016. The bonding and coating capabilities of the new tool were validated with a polymer adhesive. The quality of the bonding process were excellent and the resulting bonded stack exhibited no defect (void or de-lamination). This created a robust process suitable for production. The operational coating produced an adhesive film with no air bubbles or de-wetting areas and the bonding process obtained from this structure was defect-free.

    • A project sub-task was to select an efficient temporary adhesive for use in the new EVG560 tool. For this, a vehicle test was defined and CEA-Leti identified a polymer adhesive compatible with high temperature processes. We demonstrated that a bonded structure using the new adhesive did not exhibit de-lamination below 350°C, whereas a standard adhesive de-laminated from 250°C. This compound is thus very promising in particular for high temperature oxide deposition.

    • A study of the de-bonding process was started and CEA-Leti demonstrated the possibility of on-frame de-bonding of the new adhesive, leading to a dismounted wafer with no cracking or chipping.


    • CEA-Leti is now in a position to supply various 300 mm 3D wafers to RECIF and FOGALE for designing and testing a the new inspection tool.

OBJECTIVES

  • Through Silicon Via (TSV) is a “More-than-Moore” technology that allows development of new chip architectures. A number of challenges remain in the several process steps for making TSV products cost efficient. The project aimed to provide HVM ramp-up support and improvement in TSV product manufacturing yield.

  • Challenges addressed in the project:
    • Handling of 300 mm heterogeneous wafers with edge trim inspection
    • Development of metrology and new logistical concepts for wafers on 380mm frames
    • Improvement of temporary bonding and debonding processes.

  • Synergies were created with other CATRENE projects such as NGC450, SOI450 and MASTER_3D.
  • The project plan was broken down into four work packages extending over 3 years.
  • The industrial partners released new products to the market in 2018.

IMPACT

  • The TSV HANDY project prompted strong collaboration between CEA-Leti and EVG. It entailed setting up a new coating capability on existing equipment in the CEA-Leti clean room.

  • The project also promoted CEA-Leti as a European leader in the field of 3D integration: we supplied various 3D wafers for upgrading the inspection tool at RECIF and FOGALE.


  • The TSV HANDY project has led to delivery of an automatic platform for inspecting and handling 3D wafers. To our knowledge, it is the first time that such a tool has been developed and installed in AMKOR in an industrial
    environment.